Project Refrence List

No.Project NameProducts SpecificationQtyClientFabrication / Installation SiteContract YearContract Number
1132nd Urea & Ammonia ProjectProcess, Mechanical Design, supply of Internals & Fabrication of 1 set of Deaerator 1Kermanshah PetrochemicalKermanshah20152 UA-POR-21FE-100 77
114TZORC PMD Lube Blending PlantProcess, Mechanical Design, supply of Internals & Fabrication of 13 set of Production Tanks 13Tabriz Oil Refining CompanyTabriz201541145
115Catalyst PlantFabrication of 8 sets of drum steel 3 sets of tower steel,16 sets of drum carbon steel,8 sets of tower carbon steel35Lorestan PetrochemicalLorestan2015 
111Pataveh Gas Compressor StationProcess, Mechanical Design, supply of Internals & Fabrication of 4 sets of Two Stage Multi-cyclone Scrubbers4NIGTSTehran/ Pataveh2014 
112NGL 3200 Unit 100 & 300Process, Mechanical Design & Supply of Internals of 15 sets of Towers & Drums - NGL 3200 Unit 100 & 30015Khatam Al Anbia - Sadaf IntituteWest Karon Area2014 
107Haftkel Oil Process System Optimization ProjectProcess, Mechanical Design, Internal, Burner supply & Fabrication of 2 sets of Direct Heaters2Howe baker/Petro Part/NISOCTehran/ Haftkel2013HP/18550-001
108Gachsaran Gas Gathering & Production UpgradingDesign & Fabrication of 9 sets of C.S & S.S Shell & Tube Heat Exchangers9NISOCTEHRAN/GAC HSARAN2013 
109Methanol Production PlantProcess, Mechanical Design, supply of Internals & Fabrication of 1 set of Deaerator1Boushehr Petrochemical CoTehran/ Boushehr2013C-PV-POR-203 A/112
110Ramsar Gas Compressor StationProcess, Mechanical Design, supply of Internals & Fabrication of 4 sets of Two Stage Multi-cyclone Scrubbers4NIGTSTehran/Ramsar2013 
106Pardis 3rd Urea and Ammoniac ProjectProcess, Mechanical Design, supply of Internals & Fabrication of 2 sets of Deaerators2Namavaran/ Hedco/Pardis Petrochemical CoTehran/ Assaluyeh20123-DOR-01-PV-212
1South Pars Gas Complex, Phase 1 Odorant Production Unit 800 TPYDesign, Fabrication, Erection of Floating Roof Storage Tanks 2 Sets capacity each 20,000 m32"Jahan Pars Engineering Construction Company/ IGEDC"Tehran/ Assaluyeh2012SP1-110-9850-16-ME-0266
2South Pars Gas Field Development Phase 20 & 21Process, Mechanical Design, supply of Internals & Fabrication of 2 sets of Deaerators2OIEC/POGCTehran/ Assaluyeh2012PO-SP2021-ON-MA-0700-0052
3South Pars Gas Field Development Phase 19Design and fabrication of Small Diameter C.S Drums 95Petro Pars Iran/ POGCTehran/ Assaluyeh2011Inq. No.: SP19/H/11/147
4Pardis 3rd Urea and AmmoniaDesign and fabrication of Carbon Steel Towers with Clad Material S.S 304L4Namavaran Delvar/ Pardis Petrochemical Co.Tehran/ Assaluyeh20113-POR-01-PV-202
5Pardis 3rd Urea and AmmoniaDesign and fabrication of Carbon Steel Pressure Vessels16Namavaran Delvar/ Pardis Petrochemical Co.Tehran/ Assaluyeh20113-POR-01-PV-203
6South Pars Gas Field Development Phase 14Process, Mechanical, Electrical Design, Internals , Transformer & Control Panel Supply and fabrication of C.S Condensate Desalters with internal coating capacity 213 T/H2IMPI/POGCTehran/ Assaluyeh2011PO-14-103-0800-106
7South Pars Gas Field Development Phase 14Design and fabrication of C.S Columns according to ASME Cladded SA-316 L 10Mapna Group/ POGCTehran/ Assaluyeh2011PO-14-999-0500-0002-M
8South Pars Gas Field Development Phase 14Design and fabrication of C.S Large Diameter Drum Nace MR 0175/1515612Mapna Group/ POGCTehran/ Assaluyeh2011PO-14-999-0800-0003-M
9South Pars Gas Field Development Phase 14Design and fabrication of Drums S.S and S.S 321 Cladded Drum 5Mapna Group/ POGCTehran/ Assaluyeh2011PO-14-999-0800-0002-M
10Bid Boland Gas Treatment Plant 2nd PhaseDesign and fabrication of Onshore Drums Shell thickness 77 mm and Hemispherical Heads7Sazeh Consultant Co./ Energy Sepehr - NIGCTehran/ Bid Boland2011PO-DR-221
11Upper Gottvand Dam & H.E.P.PDesign and fabrication of Carbon Steel Pressure Vessels6FARABTehran/ Guttvand2011 
12South Pars Gas Field Development Phase 22,23 & 24Process, Mechanical Design, supply of Internals & Fabrication of Deaerators capacity 833 T/H2Nardis (FARAB)/POGCTehran/ Assaluyeh2011P-28-M-L-89-0119-00
13Forth Pataveh Gas Compressor StationsProcess, Mechanical, Internal Design and Fabricaiton of Two Stage Multicyclone Scrubbers, Fuel Gas Filters, Air Buffer and Vent Stacks Scrubbers and Filters Efficiency 99.9% of Solid & Liquid Particles ≥ 5µ8Tarh va Bazresi/IGDECTehran/ Pataveh2011TB-07-01-89
14Kupal Supplementary Gas Injection ProjectProcess design, supply of Flare Tip and Stack of Flare Package 1Tehran Berkley/NISOCTehran/ Ahwaz20117086-HT/OT-L0039
15Gachsaran Oil Field Development Process design, supply of Internals and Fabrication of Mobile Separator1NISOCTehran/ Gachsaran2011 
16Kharg Island Gas Gathering & NGL Recovery Project Process design, supply of Internals and Fabrication of C.S Reception K.O Drums Shell Thickness 65 mm with Demisters2Iritec/IOOCTehran/ Kharg Island2010140970
17Kharg Island Gas Gathering & NGL Recovery Project Process design, supply of Internals and Fabrication of C.S Drums with Demisters5Nardis (FARAB)/IOOCTehran/ Kharg Island2010P-26-M-L-89-0085-00
18Kharg Island Gas Gathering & NGL Recovery Project Process design, supply of Internals and Fabrication of Gas Compressor Suction Drums with Demisters12Iritec/IOOCTehran/ Kharg Island2010139855
19Kharg Island Gas Gathering & NGL Recovery Project Process design, supply of Internals andFabrication of K.O Drums with Demisters8Iritec/IOOCTehran/ Kharg Island2010137791
20Kharg Island Gas Gathering & NGL Recovery Project Design, Fabrication & Erection of Storage Tanks7Nardis(FARAB)/IOOCTehran/ Kharg Island2010P-26-M-L-89-0072-00
21Dehloran Production & Desalting UnitDesign & Fabrication of C.S Pressure Vessels & Columns including Internals16OEID/ICOFCOTehran/ Dehloran2010ED287-DH/C7DU024
22Persian Gulf Star HC Condesate RefineryDesign & Fabrication of C.S Columns 6Faradast Falat-Bina- Tehran Jonoob/PGSCTehran/ Bandar Abbas 2009 300000057
23Persian Gulf Star HC Condesate RefineryProcess, Mechanical Design, Internal Supply & Fabrication of Deaerators Capacity 1350 T/H2Faradast Falat-Bina- Tehran Jonoob/PGSCTehran/ Bandar Abbas 2009 300000039
24South Pars Gas Field Development Phase 17 & 18Process, Mechanical Design, Internal Supply & Fabrication of Deaerators Capacity 890 T/H2IMPI/POGC Tehran/ Assaluyeh 2009PO-1718-0706-ID-0001
253rd Shiraz Urea Ammonia Plant Process, Mechanical Design, Internal Supply & Fabrication of Deaerator Capacity 489 T/H1PIDEC/Shiraz Petrochemical Co. Tehran/ Shiraz 20081198-POR-PV-203
26Tehran Refinery Product Up-Grading Process, Mechanical Design, Internal Supply & Fabrication of Deaerator 141 T/H1Ehsan JV/ Tehran Refinery Tehran 200887-PP7837
27Shazand Arak Refinery Expnasion & Upgrading Project Process, Mechanical Design, Internal Supply & Fabrication of Deaerators of Steam Boiler & Degasifer for H2 Refomer Capacity 1400 T/H & 68 T/H3Sazeh Consultant Co./ NIOECTehran/ Arak 2008 2260-PO-ME-1-1-0801-0/0865-0
28Kashan Galvanazied Production Plant Design & Fabrication of C.S Ammonia Storage Tanks2Iritec/Fajr-Sepahan Galvanized IndustrialTehran/ Kashan 200887/872
29Shazand Arak Refinery Expnasion & Upgrading Project Design & Fabrication of C.S Drums10Sazeh Consultant Co./ NIOECTehran/ Arak 20082260-PO-ME-1-3-0301-1 (Rev.0)
30Shazand Arak Refinery Expnasion & Upgrading Project Design & Fabrication of C.S Drums 34Sazeh Consultant Co./ NIOECTehran/ Arak 20082260-PO-ME-1-3-0301-2 (Rev.0)